JLC Beam Delivery System
Contents: Machine Parameters,
Beam Delivery System ( Road Map, Previous Studies (
Layout, Collimation, Final Focus, Extraction ), Interaction Region ( Layout, Background ), IR issues (ISG,2000)
, Link
1. Machine Parameters
- 2003: Road Map Report
- Layout , (previous one)
- X-band: Overall (old), and Main Linac (old) , and SLED2 system ( Upgrade option: one DLDS, one unit, topview (8 pack, 2x4pack), side view), Optics:table, figure
- C+X-band:Overall (old), and Main Linac (old ) and RF unit
- Parameters, PDF(384KB)
- 1999 - 2000
2. Beam Delivery System
Road Map Report 2003
Previous Studies
- 2002 - NLC
- 2001 - NLC
- Layout
- Temporary; Road Map report, 2002, jpg
- JLC Design Study, 1997, jpg
- with background sources; JLC Design Study, 1997, jpg
- Reference(LC02, SLAC, 2002): NLC, jpg, and
TESLA, jpg
- Collimation System
- Final Focus System
- Extraction Line (Dump Line)
- L*=4.3m
- Tentative Design from IP to the Beam Dump (water tank of 1.6m diameter, 10m length) dated on 2003.4.14
- dump line up to the second focussing point
- L*=2m
3. Interaction Region
4. IR issues at JLC and NLC ( summary of ISG-IR ,2000)
Link