Minutes of 97th FFIR/BDSIM and 19th ILC-Asia WG4 meeting on 3/9/2005

ILC Asia WG4 : Minutes of 19th meeting
http://lcdev.kek.jp/ILC-AsiaWG/WG4notes/

Mar. 9 10:00
Rm.425 bldg.3 at KEK.

-----
(1) ATF2 budget plan in FY2005 at KEK (Tauchi)

(2) Control system for ATF2 (Terunuma, Furukawa, others)

    - Initiate discussion on ATF2 control system.
    - ATF2 control system
      * should be accommodated to the existing ATF control system,
      * should certainly deliver the beam to the beam dump.
    - Some new systems are developed based on EPICS.
    - V-system was incorporated into the current ATF control system.
    - Users can prepare their own control program in Fortran/C language.
    - So far, users have no serious problem.
    - Start to design the ATF2 control system based on the current ATF system

    - Need screen monitor in the very beginning of ATF2 so as to ensure beam goes to beam dump.

Next meeting:
Mar. 16 10:00
Rm.425 bldg.3 at KEK.
TV conference (ID=31110)
http://lcdev.kek.jp/Events/month.php

(1) ATF2 proposal
(2) ATF2 optics and instrumentation (Kuroda)
(3) BC with a RF unit and  a chicane (E. Kim)
(4) Shorter bunch length in ATF/ER (Vogel)
(5) Beam pipe diameter, space between magnets etc. (Tauchi)
(6) ATF2 DAQ system (all)
(7) RF kicker for headon collision (Iwashita)
(8) Dump line designed for GLC (Kubo)
(9) Magnets and PS (Kumada)
(10) Shintake-monitor (Suehara)
(11) Others