Contents: Plans | GM and ATF beam |
Minutes | Link | library
Nanometer BPM
Plans
Ground Motion and Beam Fluctuation at ATF
Minutes of meetings
- ATF2 : IP-BPM
- 3 August 2006, memo, Estimation of x-y isolation in the electronics and design for the ILC-like beam (3) by P.Doublet
- 27 July 2006, memo, Design for the ILC-like beam (2) by P.Doublet
- 6 July 2006, memo, Design for the ILC-like beam and the electronics test (5) by P.Doublet
- 20 June 2006, memo, MAFIA study and the electronics test (4) by P.Doublet
- 6 June 2006, memo, MAFIA study and the electronics test (3) by P.Doublet
- 23 May 2006, memo, First MAFIA study and the electronics test (2) by P.Doublet
- 8 May 2006, memo, Basic study of the IP-BPM by P.Doublet
- 18 April 2006, memo, Introduction of Philippe Doublet and work plan by 7th August 2006
- Minutes of 24th meeting on 22 September,2005 ; electronics modification, reference cavity and IP-BPMs (ATF2)
- Minutes of interim ATF Nano project meeting on 15 March,2005
- Minutes of ATF/LiCAS meeting on 4 March,2005
- Minutes of video meeting on 17 February,2005 ; BPM for FF test (ATF2) by V.Vogel, Optics designs for a bunch compressor in ATF2 by E.S. Kim, and ATF2 Tuning Studies by Deepa A.Kalinin, ATF2 Organization by T.Tauchi.
- Minutes of 23rd meeting on 27 January,2005 ; BPM for FF test (ATF2).
- Minutes of 21st meeting on 25 November,2004; Status of the beam test and plan.
- Minutes of 21st meeting on 14 October,2004 ; Status of the system and the cavity BPMs etc.
- Minutes of 20th meeting on 7 October,2004 ; Alignment of the KEK system, c-band cavity BPM, and Status of the system etc.
- Minutes of 19th meeting on 30 September,2004 ; Installation of the KEK system, c-band cavity BPM, and Status of mover system etc.
- Minutes of 18th meeting on 9 September,2004 ; Status of mover system, and c-band cavity BPM. Discussion on the schedule for installation.
- Minutes of 17th meeting on 25 August,2004 ; Status of mover system, laser frame system and c-band cavity BPM. Discussion on the schedule for installation.
- Minutes of 16th meeting on 20 May,2004 ; New BPM electronics beam test(2), laser frame configuration.
- Minutes of 15th meeting on 28 April,2004 ; New BPM electronics beam test, laser frame configuration and vibrational measurement of the granite table and the reference bar.
- Minutes of 14th meeting on 1 April,2004 ; Mover Controller and BPM electronics, Optical Anchor System with laser BPMs.
- Minutes of 13th meeting on 19 February,2004 ; performance of prototype mover, thermal distortion, optical anchor and GM measurement at ATF and KEK BPMs.
- Minutes of 12th meeting on 22 January,2004 ; performance of prototype mover, optical anchor and laser seismometer.
- Minutes of 11th meeting on 25 December,2003 ; X-band cavity BPM, optical anchor issue, prototype mover, update of the reference system and schedule.
- Minutes of 10th meeting on 4 December,2003 ; Laser seismometer, final design of the reference system and a proposal of the measurement method for reference bar device and ground motion utilizing interferometer and linear transition of light in vacuum.
- Minutes of 9th meeting on 20 November,2003 ; Vertical fluctuation observed by the Laser wire at ATF-DR, updates on the reference system and the LLNL support, and review of optical anchor.
- Minutes of 8th meeting on 30 October,2003 ; Girder and reference frame design, Active feedback prototype and laser interferometer and discussion on the mini-workshop.
- Minutes of 7th meeting on 16 October,2003 ; Position monitors, KEK NanoBPM design and discussion on the mini-workshop, GM measurement at ATF and near future plan.
- Minutes of 6th meeting on 19 September,2003 ; Nano BPM collaboration plan, GM measurement at ATF, prototype design.
- Minutes of fifth meeting on 8 August,2003 ; Updated design of three BPM system and the reference block, and the QPD performance.
- Minutes of fourth meeting on 25 July,2003 ; Design of three BPM system and design of reference block, future schedule.
- Minutes of third meeting on 27 June,2003 ; stabilization of three BPMs.
- Minutes of meeting with SLAC group on 12 June,2003 ; KEK support system, results from this beam tests.
- Minutes of meeting with SLAC group on 4 June,2003 ; Requirements for the support system, some results from March experiment, cavity BPM with selective coupler, questions to the Livermore group and discussion.
- Minutes of second meeting on 28 May,2003 ; specification of BPM mover, KEK high technology, Livermore system.
- Minutes of first meeting on 13 May,2003 to discuss purpose and plan
Links
Major : NanoBPM | SLAC NanoBPM
- Third Mini-Workshop on Nano Project at ATF, 30-31 May, 2005, at KEK.
- MDI Workshop, 6-8 January, 2005, SLAC, our talk list
- ATF2 Mini-Workshop, 5 January, 2005, SLAC, our talk list
- Second Mini-Workshop on Nano Project at ATF, 11-12 December, 2004, at KEK.
- Laser-wire
collaboration
- First Mini-Workshop on Nano Project at ATF, 5-6 June, 2004, at KEK.
- Workshop summary presented at the Laser wire mini-workshop by T. Tauchi,24 June 2006 (pdf, 35.4MB) .
- 2nd Nanometer-BPM Mini-Workshop, 4-5 November,2003
- Report (Japanese) to the LC project committee by T. Tauchi,14 November 2003.
- Talks from KEK (Temporary) to be stored in the workshop home page.
- Performance of Active Vibration Isolation System at KEK, R. Sugahara (pdf, 16.4MB)
- Stabilization Projects at SLAC,J. Frisch (ppt, 4.7MB)
- Development of NanoBPM support system in KEK, Y. Honda (pdf, 1.5MB)
- FEATHER progress report, N. Delerue (pdf, 806KB)
- Development of High resolution Cavity BPM,Y. Inoue (pdf, 806KB)
- Cavity BPM for X-band linac, T. Naito (ppt, 2.9MB)
- Nanometer-BPM Mini-Workshop, 10-12 March,2003
- ATF2 minutes (Japanese): final focus beam with "new optics" at ATF.
Library
Reports on QBPM and IP-BPM
Reported colored green are written in English, while the black ones are written in Japanese. The abstracts and titles of all the reports are written in English.
- "RF measurement of ATF2 Reference cavities", Y.Inoue, Y.Honda, 5 March 2008, abstract, pdf , 4 pages, 540kB
- "RF measurement in IPBPM of BSM", Y.Inoue, Y.Honda, 4 March 2008, abstract, pdf , 5 pages, 708kB
- "Multi-bunch feedback using IPBPM (3 bunches)", Y.Inoue, T.Nakamura, Y.Honda, 22 February 2008, abstract, pdf , 10 pages, 576kB
- "Development of Beam-position Monitors with High Position Resolution", Master Thesis by T. Nakamura, Department of Physics, Graduate School of Science, The University of Tokyo, 3 February 2008, abstract, pdf , 139 pages, 6.9MB
- "Multi-bunch feedback using IPBPM (FEATHER3)", Y.Inoue, Y.Honda, H.Shimizu, 8 February 2008, abstract, pdf , 11 pages, 640kB
- "Stability of Q-BPM", Y.Honda, Y.Inoue, 25 July 2007, abstract, pdf , 4 pages, 466kB
- "Bore aperture measurement of QEA magnets", Y.Honda, 20 July 2007, abstract, pdf , 7 pages, 574kB
- "RF measurement of ATF2 Q-BPMs", Y.Honda, Y.Inoue, 16 July 2007, abstract, pdf , 10 pages, 825kB
- "RF cable for ATF2 Q-BPM", T.Nakamura, 6 July 2007, abstract, pdf , 14 pages, 935kB
- "Position error of tap holes on ATF2 Q-magnets", Y.Honda, Y.Inoue, 3 July 2007, abstract, pdf , 10 pages, 495kB
- "Vacuum pipe of new Shintake monitor", Y.Honda, T.Nakamura, T.Suehara, 19 June 2007, pdf , 7 pages, 751kB
- "RF test for KNU IP BPM cold model", by S.H.Shin, 20 June 2007, abstract, pdf , 4 pages, 6.4MB
- "Tests on the variable attenuator for IPBPM", Y.Honda, 29 March 2007, abstract, pdf , 6 pages, 264kB
- "Bunch length monitor using beam spectrum", Y.Honda, T.Nakamura, K.Sakaue, 26 January 2007, abstract, pdf , 10 pages, 1.5MB
- "Angle sensitivity of IPBPM", T.Hino, Y.Honda, Y.Inoue, T.Nakamura, S-H.Shin, 12 November 2006, abstract, pdf , 10 pages, 671kB
- "Bench test of converter module", Y.Honda, 24 October 2006, abstract, pdf , 10 pages, 1.1MB
- "Pulse shape of IPBPM", T.Hino, Y.Honda, Y.Inoue, T.Nakamura, S-H.Shin, JH.Yue, 12 November 2006, abstract, pdf , 8 pages, 1MB
- "Narrow band detection electronics for a strip-line BPM", Y.Honda 26 October 2006, abstract, pdf , 18 pages, 1.6MB
- "Bench test of limiter/int detector module", Y.Honda, 23 October 2006, abstract, pdf , 9 pages, 599kB
- "Bench test of phase detector module", Y.Honda, 18 October 2006, abstract, pdf , 14 pages, 975kB
- "Beam Locked L.O. for IP-BPM", Y.Honda, 16 October 2006, abstract, pdf , 9 pages, 751kB
- "Resolution analysis of Mar.7/2006 data", Y.Honda and Y.Inoue, 16 August 2006, abstract, pdf , 14 pages, 1.8MB
- "Study of an electron Beam Position Monitor (Draft)", Philippe Doublet, August 2006, pdf , 27 pages, 1.3MB
- "Summary of the first IP-BPM electronics tests", by P.Doublet, 21 July 2006, pdf , 11 pages, 882KB
- "Summary of the first experimental tests of the cavity of the IP-BPM", by P.Doublet, 26 June 2006, pdf , 6 pages, 147KB
- "Study on IP-BPM pulse shape", by P.Doublet, T.Hino, Y.Honda, Y.Inoue, T.Nakamura, 18 June 2006, abstract, pdf , 9 pages, 4.2MB
- "Position sensitivity test of IP-BPM", by P.Doublet, T.Hino, Y.Honda, Y.Inoue, T.Nakamura, 9 June 2006, abstract, pdf , 6 pages, 378KB
- "First Simulation of IP-BPM by MAFIA", P. Doublet, 20 May 2006, abstract, pdf , 11 pages, 488KB
- "Angle sensitivity of Cavity BPM", by Y.Honda and Y.Inoue, 19 May 2006, abstract, pdf , 6 pages, 353KB
- "Beam test of ATF2 Q-BPM electronics", Y.Honda, 28 April 2006, abstract, pdf , 9 pages, 464KB
- "An introduction to rectangular Cavity Beam Position Monitors", Philippe Doublet, 23-25 April 2006, abstract, pdf , 12 pages, 303KB
- "RF measurement of IP-BPM cold model", by Y.Honda, 6 April 2006, abstract, pdf , 6 pages, 1MB
- "Summary of requirements on Q-BPM in the ATF2", Y.Honda, 26 January 2006, abstract, pdf , 3 pages, 79KB
- "Electronics test using a beam signal", by T.Hino, Y.Honda, Y.Inoue, 20 January 2006, abstract, pdf , 10 pages, 801KB
- "Electronics for IP-BPM", by Y.Honda, 12 January 2006, abstract, pdf , 11 pages, 518KB
- "Test of Charge ADCfs characteristics", by Y.Honda, 6 January 2006, abstract, pdf , 5 pages, 244KB
- "Electronics test with a dummy pulse", by Y.Honda, 5 January 2006, abstract, pdf , 7 pages, 788KB
- "Loss in transferring signal from the BPM to the electronics", by Y.Honda, 2 January 2006, abstract, pdf , 3 pages, 160KB
- "Test of SLAC electronics", by Y.Honda, 30 December 2005, abstract, pdf , 4 pages, 296KB
- "Improvement of BPM electronics (converter)", by Y.Honda, 27 December 2005, abstract, pdf , 8 pages, 564KB
- "Mechanical stability of Q-BPM", Y.Honda, 20 December 2005, abstract, pdf , 6 pages, 716KB
- "Electrical center measurement before and after the cavity tuning ", by T.Hino, Y.Honda, W.H.Hwang, Y.Inoue, S.H.Kim, S.J.Park, Y.J.Park, 7 December 2005; abstract, pdf , 6 pages, 240KB
- "Beam test of prototype BPM after tuning", by Y.Honda, W.H.Hwang, Y.Inoue, S.H.Kim, A.Liapine, S.J.Park, Y.J.Park , 2 December 2005; abstract, pdf , 6 pages, 310KB
- "XY-isolation tuning using the tuners", by Y.Honda and Y.Inoue, 25 November 2005; abstract, pdf , 5 pages, 344KB
- "Repeatability of antenna measurement device", by Y.Honda and Y.Inoue, 28 November 2005; abstract, pdf , 5 pages, 316KB
- "Update on IP-BPM design", by Y.Honda, 23 November 2005; abstract, pdf , 5 pages, 328KB
- "Electrical center measurement of PAL BPM", by Y.Honda and Y.Inoue, 22 November 2005; abstract, pdf , 15 pages, 508KB
-
"Transient signal of cavity BPMs", by Y.Honda and Y.Inoue, 18 November 2005; abstract, pdf (English), 4 pages, 331KB
- "First beam test of prototype cavity BPM for ATF2", by Y.Honda and Y.Inoue, 11 November 2005; abstract, pdf (English), 9 pages, 1.1MB
- "Signal improvement of modified KEK cavity BPM", by Y.Honda and Y.Inoue, 8 November 2005; abstract, pdf (English), 9 pages, 1.1MB
- "Effect of frequency split on xy-isolation of a cavity BPM", 6 November 2005; abstract, pdf (Japanese), 6 pages, 382kB
- "RF measurements of Prototype Cavities for ATF2 Q-BPM", by Y.Honda, Woon-Ha Hwang, Seung-Hwan Kim, Yong-Jung Park, 25 October 2005; abstract, pdf (English), 8 pages, 741kB
- "Port measurements of KEK test model for ATF2 Q-BPM", 10 October 2005; abstract, pdf (English), 5 pages, 471kB
- "Optimizing slot position of IP-BPM", 3 October 2005; abstract, pdf (Japanese), 6 pages, 350kB
- "Detuning the Reference Cavity", 4 October 2005; abstract, pdf (Japanese), 5 pages, 1.1MB
- "Wave guide to Coaxial cable Adapter for IP-BPM", 27 September 2005; abstract, pdf (Japanese), 7 pages, 346kB
- "Output power from KEK Cavity BPM", 23 September 2005; abstract, pdf (Japanese), 7 pages, 572kB
- "Post Production Check Items for Cavity BPM", 14 September 2005; abstract, pdf (English), 3 pages, 59kB
- "Gap length and Aperture of IP-BPM Cavity", 13 September 2005; abstract, pdf (Japanese), 4 pages, 164kB
- "Layout of IP-BPM", 12 September 2005; abstract, pdf (Japanese), 6 pages, 314kB, and IP-BPM parameters(pdf)
- "Shielding the Reference Cavity", 9 September 2005; abstract, pdf (Japanese), 4 pages, 578kB
- "Understanding the Strange signal of KEK cavity BPM", 7 September 2005; abstract, pdf (Japanese), 7 pages, 965kB
- "Coupling (&beta) measurement of the cavity BPM ports", 31 August 2005; abstract, pdf (Japanese), 6 pages, 332kB
- "Measurement of X-Y coupling in the cavity BPM", 29 August 2005; abstract, pdf (Japanese), 4 pages, 149kB
- "Study on the head amplifier of the converter module", 25 August 2005; abstract, pdf (Japanese), 5 pages, 180kB
- "Measurement of coupling between the reference and the sensor cavity", 9 August; abstract, pdf (Japanese), 6 pages, 304kB
- "Study on signal loss and gain in the cavity BPM converter electronics", 18 July 2005; abstract, pdf (Japanese), 5 pages, 156kB
- "Effect of the local oscillator's quality on the overall noise of the cavity BPM electronics", 7 July 2005; abstract, pdf (Japanese), 5 pages, 196kB
- "Signal loss factor measurement of the new cables", 29 March 2005; abstract, pdf (Japanese), 3 pages, 196kB
- "Beam test report (Feb.25)", 9 March 2005; abstract, pdf (Japanese), 14 pages, 2.4MB
- "Band width optimization for Cavity BPM electronics", 23 January 2005; abstract, pdf (Japanese), 6 pages, 480kB
- "Noise survey of the Cavity BPM electronics", 23 December 2004; abstract, pdf (Japanese), 9 pages, 741kB