year mon. ATF GLCTA Fast Feedback Loop Nano BPM project
FONT/FEATHER SLAC/LLNL KEK
2004 6     jitter meas./feedback test beam test one cavityBPM
7 ext. kicker and septum;multipole, power supply   update the kicker and electronics   installation of KEK system
8    
9    
10 multi-bunch emittance,wiggler,stable extraction and multi-train extraction   /feedback test start to construct metrological frame  
11   3 BPMs with superfast BPM electronics/feedback test    
12        
2005 1          
2     /feedback test installation of the frame  
3     1st feedback test    
4          
5          
6     2nd feedback test    
7 new extraction kicker ? concrete shield extension   installatio of optical anchor  
8    
9      
10   feedback with multi-train nano BPM test with two systems
11   beam line in GLCTA tunnel
12  
2006 1        
2   Two Nano BPM systems with FONT/FEATHER
3  
4  
5  
6  
7   beam line in ATF      
8        
9        
10        
11        
12          
2007 1
2
3
4
5
6
7
8
9
10
11
12